SUBSTATION EXPANSION FOR SCHLUTER FACILITIES
  • Schluter Systems received a substation expansion pricing package to support the energy needs of their new facility in Plattsburgh, NY.
  • The  challenge  lay  in  the  opaque  cost  breakdown,  clarity  in  design efficiency, equipment selection—particularly the 34.5kV extension from Kent Falls Substation—and system reliability under peak loads.
  • A thorough validation was needed to ensure alignment with long-term operational   goals   and   to   identify   any   overlooked   cost-effective alternatives.

Conducted a detailed analysis of the substation expansion proposal, focusing on:

  • 34.5kV feeder extension design and load-handling capacity.
  • Equipment specifications: transformers, breakers, capacitor banks, and switches.
  • System reliability under peak load and contingency conditions.
  • Assessed transformer loading profiles to validate operational efficiency.
  • Identified potential overdesign in protection and control schemes.
  • Provided a structured engineering review report with cost-optimization recommendations.
  • Identified cost savings through targeted design optimizations.
  • Recommended strategic adjustments in equipment selection (e.g., optimized breaker ratings, dual-secondary transformer configuration).
  • Improved  system  reliability  and  efficiency  based  on  IEEE 1366 & NESC C2-2023 standards.
  • Provided technical validation to support informed decision- making.
  • Ensured infrastructure alignment with long-term operational and scalability requirements.

 