DESIGN SUPPORT SERVICES FOR CMP DA LOCATIONS PROGRAM

  • Managing   numerous   geographically   dispersed sites, each   requiring accurate field data and strict adherence to centralized tracking systems.

  • Ensuring all  engineering designs meet rigorous Avangrid and CMP standards to guarantee ongoing compliance, safety, and constructability.

  • Proactively navigating  multi-jurisdictional road permitting processes to prevent schedule impacts on critical-path locations.

  • Maintaining real-time project visibility and proactive communication to swiftly mitigate risks and ensure continuous alignment.

  • Executing a standardized workflow from desktop scoping to ongoing field visits, capturing precise data (GPS, birthmarks, vegetation) and uploading it directly to CMP’s Fulcrum database.

  • Continuously developing and refining AutoCAD drawings and SAP Work Orders, followed by rigorous internal QA/QC checks, for timely issuance of “Issued for Construction” (IFC) packages.

  • Actively leading the permitting effort, coordinating with agencies and CMP to prioritize sites and facilitate Traffic Control Plan (TCP) approvals as construction progresses.

  • Driving project transparency through weekly progress reports, real-time tracker updates (Echelon, DA Tracker), and coordination meetings to maintain momentum.

  • Consistently delivering construction-ready IFC Packages and SAP Work Orders to enable seamless construction mobilization and minimize schedule delays.

  • Enabling Data-Driven Decisions: Providing a continuous stream of reliable, centralized data via Fulcrum uploads, giving the CMP team the real-time site intelligence needed for informed planning.

  • Actively securing Road Permits ahead of construction needs, ensuring that complex jurisdictional requirements do not become critical path obstacles.

  • Ensuring  all  AutoCAD  Construction  Drawings  comply with standards as the project evolves, protecting grid integrity throughout the rollout.

  • Maintaining strategic alignment through consistent weekly reporting and updates, functioning as an integrated extension of the CMP team to adapt to evolving project needs.

  • DST provided data, maps, charts, and calculations in a format easily accessible by ComEd.
  • DST successfully identified necessary grid upgrades and provided cost estimates for DER integration.
  • Throughout this program, DST ensured smooth communication and documentation, meeting regulatory and technical requirements for DER interconnection.