69 KV UNDERGROUND TRANSMISSION LINE DESIGN & INSTALLATI ON

  • PSEGLI required the development of a 69 kV underground transmission line spanning approximately 1.4 miles to connect a substation to a new riser pole.
  • A critical challenge involved performing a jack and bore crossing beneath an active MBTA railroad, which required rigorous permitting and coordination with multiple agencies.
  • The urban alignment also demanded careful civil design, including manhole grounding and duct bank routing, while ensuring electrical reliability through accurate conductor sizing.
  • DST Engineers led the complete civil and electrical design for the underground transmission system.
  • Using CYME CAP analysis, the team performed thermal and conductivity evaluations to determine the optimal conductor size to meet PSEGLI’s load and performance requirements.
  • DST developed detailed construction drawings, trench sections, duct bank profiles, and grounding designs for manhole structures.
  • The team also managed all permitting activities, preparing and submitting a comprehensive permit package for approval by the MBTA and the City of Hewlett, including detailed engineering drawings, bore profiles, traffic management plans, and environmental compliance documentation.
  • DST coordinated closely with PSEGLI, municipal agencies, and the MBTA to streamline the approval process and enable the timely construction of the crossing and transmission route.
  • Engineered and permitted a 1.4-mile, 69 kV underground
    transmission route in a dense urban environment.
  • Designed and submitted a full permit package to the MBTA and local municipality, including bore crossing and civil layout details.
  • Conducted CYME CAP thermal modeling to optimize conductor size.
  • Designed a jack & bore crossing under active railroad
    infrastructure.
  • Developed and implemented grounding strategies for manhole installations.
  • Integrated system from the substation exit point to riser
    pole termination.
  • DST provided data, maps, charts, and calculations in a format easily accessible by ComEd.
  • DST successfully identified necessary grid upgrades and provided cost estimates for DER integration.
  • Throughout this program, DST ensured smooth communication and documentation, meeting regulatory and technical requirements for DER interconnection.