Steady-State Reassessment for 60 MW Load Integration within Utility's Transmission Planning Portfolio
  • System  Impact  Re-evaluation   for  60  MW  Greenidge   Load  Under Evolving Grid Conditions:
  • Post-initial  SIS,  changes  in  NYISO  transmission  topology  and load/generation  profiles required verification of thermal/voltage  violations at Bus 134850 (Greenidge).
  • Critical   unknowns   included contingency   performance  (N-1/N-2)   on adjacent  branches/transformers using  NYSEG’s  existing  SIS  contingency deck  and  voltage  stability  under  revised  profiles—excluding  dynamic effects.

Dual-Scenario Modeling:

  • Base  Case:  NYSEG-supplied  power  flow  case  (retaining  retired  106 MW Greenidge generator for auxiliary consistency).
  • Project  Case:  Integration  of 60 MW  load  at Bus 134850  using  updated NYSEG load/generation  profiles.

Violation Analysis:

  • Screened  N-1/N-2  contingencies  (3–4  bus  perimeter  from  existing  SIS deck).
  • Monitored   thermal   limits   (lines/transformers)  and   voltage   deviations within NYSEG-defined  subsystem boundaries.

Model Integrity:

  • Validated swing bus stability (minimal load impact) and excluded dynamics/redispatch per scope.
  • Quantified  thermal  overloads  (specific  branch  IDs)  and voltage excursions (bus levels) under N-1/N-2 events.
  • Compared base vs. project cases: Identified loading deltas (>90% critical branches) and voltage drop thresholds.
  • Delivered    audit-ready    cases    with    Greenidge    load integration and auxiliary unit retention logic.