Transmission/Generation Facility Load Studies
  • High-Voltage  Complexity:  Execute  4  large-scale  studies  (115kV–325kV)  assessing  new  load  impacts  on  Avangrid’s  transmission network, ensuring compliance with Avangrid Standardized Interconnection Requirements (SIR),  Maine’s Level 4 interconnection standards, and NERC reliability standards.
  • Regional Variability: Navigate differing interconnection rules across New York and Maine, requiring adaptive technical and regulatory workflows.
  • Scaled Deadlines: Manage concurrent CESIR applications and system impact studies under aggressive timelines.
  • Performed thermal, voltage, and stability analyses for all 4 projects, identifying  transmission  line  upgrades,  substation  modifications, and protection system enhancements.
  • Developed protection & control upgrade plans (breakers, bus configurations, transformer relays) and SCADA/communication protocols for seamless integration.
  • Produced project-specific cost models (materials, labor, equipment)
  • Centralized  one-line  diagrams,  facility  assessments,  and  CESIR documentation in a shared repository for Avangrid teams.
  • Delivered system specifications, an assessment of existing attachment facilities, and preliminary cost estimates for required upgrades.
  • Provided a detailed analysis of necessary transmission line or substation upgrades and a cost breakdown for materials, labor, and equipment.
  • Developed a final report, including thermal, voltage, and stability assessments, recommended system enhancements, and a finalized facility study meeting all compliance standards.
  • Provided grounding study analysis for existing and greenfield substations and switching yards.

 