Utility Transmission Design Project
  • DPL faced limitations in their existing transmission infrastructure that hindered:
  • Grid Modernization: Existing poles couldn’t accommodate a new capacitor bank, a crucial component for regulating voltage and improving grid efficiency.
  • Future Expansion: The current pole configuration at the Point of Interconnection (POI) restricted the installation of a perpendicular tap, limiting future grid connections.
  • Increased Capacity: Existing poles lacked the strength and size to support a heavier, three-phase regulator bank needed for enhanced voltage regulation.
  • DST Engineers undertook a strategic replacement of seven (7) key transmission poles:
  • Capacitor Bank Support: Three poles were replaced with taller poles, each with a minimum height of 75 feet, to accommodate the new capacitor bank. Additionally, two adjacent poles were replaced to mitigate potential uplift concerns.
  • Improved POI Accessibility: A pole at the POI was upgraded to a higher class and strategically lifted at least five feet to create space for a perpendicular tap.
  • Regulator Bank Accommodation: Three poles supporting a regulator bank were replaced with taller, 75-foot minimum poles to allow for the installation of a threephase regulator bank.
  • PLS-CADD analysis validated the poles’ ability to support the regulator bank and maintain stability under operational conditions.
  • Plan & Profile Drawings: Visual representations of pole replacements and upgrades, ensuring design clarity and implementation accuracy.
  • Pole Data Sheets: Detailed specifications and capacities for each pole, confirming the integrity and suitability of the infrastructure.
  • Structure Assembly Drawings: Drawings outlining the assembly of new poles, capacitor bank, and regulator bank for proper installation.
  • Hardware Assembly Drawings: Illustrations of hardware
    components like connectors and support structures necessary for
    installation.
  • Bill of Materials: A list of required materials for accurate cost estimation, procurement, and planning.
  • Construction Staking Drawings: Drawings marking pole
    locations and adjustments to guide installation, ensuring compliance with design specifications.
  • DST provided data, maps, charts, and calculations in a format easily accessible by ComEd.
  • DST successfully identified necessary grid upgrades and provided cost estimates for DER integration.
  • Throughout this program, DST ensured smooth communication and documentation, meeting regulatory and technical requirements for DER interconnection.

Get a Quote