Design Support Services For Utility's DA Locations Program
Managing numerous geographically dispersed sites, each requiring accurate field data and strict adherence to centralized tracking systems.
Ensuring all engineering designs meet rigorous Avangrid and CMP standards to guarantee ongoing compliance, safety, and constructability.
Proactively navigating multi-jurisdictional road permitting processes to prevent schedule impacts on critical-path locations.
Maintaining real-time project visibility and proactive communication to swiftly mitigate risks and ensure continuous alignment.
Executing a standardized workflow from desktop scoping to ongoing field visits, capturing precise data (GPS, birthmarks, vegetation) and uploading it directly to CMP’s Fulcrum database.
Continuously developing and refining AutoCAD drawings and SAP Work Orders, followed by rigorous internal QA/QC checks, for timely issuance of “Issued for Construction” (IFC) packages.
Actively leading the permitting effort, coordinating with agencies and CMP to prioritize sites and facilitate Traffic Control Plan (TCP) approvals as construction progresses.
Driving project transparency through weekly progress reports, real-time tracker updates (Echelon, DA Tracker), and coordination meetings to maintain momentum.
Consistently delivering construction-ready IFC Packages and SAP Work Orders to enable seamless construction mobilization and minimize schedule delays.
Enabling Data-Driven Decisions: Providing a continuous stream of reliable, centralized data via Fulcrum uploads, giving the CMP team the real-time site intelligence needed for informed planning.
Actively securing Road Permits ahead of construction needs, ensuring that complex jurisdictional requirements do not become critical path obstacles.
Ensuring all AutoCAD Construction Drawings comply with standards as the project evolves, protecting grid integrity throughout the rollout.
Maintaining strategic alignment through consistent weekly reporting and updates, functioning as an integrated extension of the CMP team to adapt to evolving project needs.